Investigation of a problem/situation/opportunity/need and develop a design brief for an integrated controlled system including evaluation criteria
Researching, devising, designing and modelling design options
Planning the creation of the system
Use of tools, equipment and machines to make the system
Realisation of an integrated controlled system
Use of diagnostic test procedures and interpreting test data
Project management to realise the preferred option
Evaluating the use of the systems engineering process, including finished, integrated controlled system